Using dry mortar mix for paving joints is a common method of filling the gaps between pavers or stones. Here is a step-by-step guide on how to mix dry mortar for paving joints:
Materials and Tools Needed:
Step 1: Determine the Amount of Mortar Mix Needed Measure the area to be filled and calculate the amount of dry mortar mix required. The recommended ratio for dry mortar mix is typically 3 parts sand to 1 part cement. You can use a wheelbarrow or mixing tray to mix the dry ingredients.
Step 2: Mix the Dry Mortar Mix Empty the dry mortar mix into the wheelbarrow or mixing tray. Use a shovel to make a small well in the center of the dry mix. Slowly pour water into the well, while mixing the dry mix with a trowel or pointing tool. Gradually add water until the mixture becomes smooth and workable. The recommended water-to-dry mix ratio is usually 0.25 to 0.35.
Step 3: Fill the Paving Joints Use the trowel or pointing tool to scoop up the mortar mix and push it into the gaps between the pavers or stones. Press down firmly to ensure that the gaps are completely filled. Use a broom to sweep off any excess mortar from the surface of the pavers or stones.
Step 4: Allow the Mortar to Set Allow the mortar mix to set for 24 hours before walking or driving on the paved surface. This will ensure that the mortar is fully cured and hardened.
Step 5: Finish the Paved Surface After the mortar has set, you can finish the paved surface by cleaning the surface with a broom and rinsing it off with water. This will remove any residual mortar from the surface of the pavers or stones.
In conclusion, using dry mortar mix for paving joints is an effective way to fill gaps between pavers or stones. By following these steps, you can mix dry mortar and fill the gaps quickly and easily, resulting in a smooth and even paved surface.